| Item | Details |
|---|---|
| Agency | URA |
| Applicant access | Individuals with Singpass; UEN-registered businesses with Corppass; Authorised individual filers; Authorised business filers |
| Processing estimate | 10 working days |
| Validity | Duration is assessed individually, typically three years or longer. |
Scope and eligibility
This application is for continuing an existing use approved under Temporary Permission (TP). Plan the renewal around the three-month period before expiry. The directory's introduction and overview word this timing differently; confirm the filing window with URA before relying on a particular date.
Application steps
- Check the current TP and approved use
- obtain owner consent and prepare the Fire Safety Certificate
- submit the renewal with relevant agency approvals and any LBC liability notice
- settle any LBC assessed by SLA.
Documents to prepare
- Owner consent
- SCDF Fire Safety Certificate
- LBC liability notice if applicable
- other agency clearances such as NEA or PUB.
Attachment filenames must be no longer than 130 characters and use letters, digits, underscores or hyphens. Spaces are converted to underscores. Check the accepted file formats and size for each upload field in the official application.
Fees and validity
| Fee item | Published amount |
|---|---|
| Renewal application | S$500 |
Duration is assessed individually, typically three years or longer.
Important details and examples
Renewing planning permission does not replace other operating licences. Maintain the approved use, fire-safety compliance and relevant food, liquor or storage permissions.
Official sources
Read the official GoBusiness entry ↗
Open the official application service ↗
- View submission guide ↗
- LBC estimator ↗
- here ↗
- SLA’s website ↗
- SCDF's website ↗
- link ↗
- Changing the Use of Your Property ↗
- https://www.jtc.gov.sg/get-help/development-and-renovation-works/guide-to-apply-for-plan-consent ↗
- https://www.hdb.gov.sg/shops-and-offices/managing-an-hdb-shop-or-office/change-of-use ↗
- https://www.nea.gov.sg/our-services/development-control/guidelines-for-building-plan-submission/industrial-siting-consultation ↗
- https://www.eservices.pub.gov.sg/bpp/account ↗